BÉTONIQ · PRO
Concrete, steel, soil · West and Central Africa

Your building site, calculated from column to quote

Design to BAEL 91 or Eurocode 2: take-offs, logistics and costing follow, with nothing typed twice.

Calculation report · Column P4

BAEL 91
Load take-down3 storeys · 20 m² area0.57 MN
Column 30×30buckling λ = 24.2 · short4 HA 12 ✓
Pad footingsoil checked · 1.75 × 1.75 m5 HA 12 ✓
Concrete + steel take-offcarried over · 34 kg rebar1.65 m³

One input, the whole site

Every calculation in the workshop feeds the take-off. The take-off feeds logistics, costing and the budget. Nothing is entered twice.

  1. Workshop

    Column, footing, slab: sized and justified.

  2. Take-off

    Quantities for each level, carried over from the workshop.

  3. Logistics

    Sand and gravel truckloads, trucks, blocks, water.

  4. Cost

    Bags, truckloads, bundles: what you buy, at your prices.

  5. Budget

    Direct cost, overheads, contingencies, margin and VAT.

  6. Documents

    Calculation reports, take-offs, site reports: Word, Excel, PDF.

Cross-section of a 40×40 reinforced concrete column, eight HA20 bars, HA8 ties40 cm40 cmenrobage 3 cm8 HA20AB

Where other tools estimate, BÉTONIQ PRO designs

No ratio pulled out of thin air: the actual section, standard commercial reinforcement and the code check, compared with the profession's reference methods.

  • Load take-down
  • Pad footing
  • Strip footing
  • Column and buckling
  • Beam in bending
  • Staircase
  • One-way or two-way slab
  • Retaining wall

289 calculation sheets, 13 disciplines

A design office's calculations, with their codes: BAEL, Eurocodes 2 and 3, RPA, CM66, Fascicule 62.

80

Reinforced concrete (EC2)

  • EC2 column (buckling, creep, reinforcement layers)
  • Slab punching shear
  • Complete pad footing (BAEL)
  • Deep beam
  • Solid slab on four supports
49

Geotechnics

  • Pile bearing capacity (pressuremeter method)
  • Footing settlement
  • Active and passive earth pressure coefficients (Caquot-Kérisel)
39

Quick pre-design

  • Load take-down
  • Pad footing
  • Staircase
34

Structural mechanics

  • Continuous beam (three-moment method)
  • Deflection of a uniformly loaded span
  • Portal frame
23

Section analysis

  • N-M interaction diagram
  • Arbitrary section at ULS
  • Moment of inertia of a cracked T-section
14

Technical appendices

14

Steel structures

12

Seismic (RPA)

7

Bracing

7

Finishes

4

Composite steel-concrete

3

Prestressed concrete

3

Bridges and civil structures

Documents ready to hand over

Produced by the calculation itself, under your company letterhead, with your units, currency and prices.

  • WordCalculation reportInputs, calculation steps, results and checks, under your letterhead.
  • ExcelQuantity take-offDimensions, formulas and a summary for each level.
  • ExcelCost and direct costYour editable prices, amounts and recalculated totals.
  • WordReports, contracts, lettersSite reports, inspection sheets, CSTB forms.
  • PDFEvery pagePrinted on A4, with header and page numbers.
Quantity take-off exported to Excel: foundations and ground floor, dimensions, formulas and totals per item
Word calculation report for a pad footing: title block, inputs, calculation steps and soil check

Pricing

7-day full trial, no credit card. Pay by Mobile Money or card.

Starter

5,000 FCFA / month

or 50,000 FCFA / year, 2 months free

  • 56 essential calculation sheets
  • Project take-off, logistics, cost and budget
  • Site documents and Word, Excel, PDF exports
Try it free
Most popular

Pro

20,000 FCFA / month

or 200,000 FCFA / year, 2 months free

  • 166 calculation sheets (Eurocode 2, sections, cracking…)
  • Everything in Starter, plus the Gantt schedule per level
  • Company workspace: one shared subscription
Try it free

Enterprise

60,000 FCFA / month

or 600,000 FCFA / year, 2 months free

  • All 289 sheets (geotechnics, RPA seismic, steel…)
  • Everything in Pro, up to 7 accounts in the company
  • For design offices and general contractors
Try it free
Compare plans in detail →

Your next project, calculated end to end

Seven days to try everything, on a real project.

Try it free